Boom Repairs

A general rigging inspection this morning revealed a critical failure - the cotter pins holding the boom pin at the gooseneck failed and the boom separated from the mast. Underway repairs included fashioning new washers from the top of a raison tin.

Search TR2019 Search TR2019

Login